The Express

Working time : 10 days

For this scene, I was inspired by « Darjeeling Limited » while adopting a cartoon style.
The modelling part took me 4 days, the UV’s unwrapping 2 days and the texturing 3 days.

Scene’s counter :
180 000 triangles,
3 textures (2×512 et 1×1024).

  • Share